Palm Beach Undergrounding Power Switchover: Your Three-Utility Closeout Tracker
Track your Palm Beach home's FPL, Xfinity and AT&T conversions, service checks, appointments and restoration in one clear record before your seasonal return.
Your Palm Beach home needs more than a single “undergrounding complete” note. You need to know which provider has confirmed conversion, whether your household systems actually work, and what remains unfinished outside. Keeping those answers separate gives you a clearer handoff before your seasonal return.
By Black Tie White Glove
Updated September 11, 2026
The tracker below is a recommended owner workflow, not an official Town checklist or a record of completed Black Tie White Glove work.
Confirm your phase and address-specific notice first
As of September 11, 2026, the Town of Palm Beach’s undergrounding homepage lists a September 10 notice covering four phases—6S, 7N, 7S and 8—for the September 14 workweek. That listing establishes project activity; it does not confirm a power interruption or conversion appointment at your home. Source: Town undergrounding homepage.
Start your record with your full service address, phase, notice date and the notice itself. If your phase is unclear, ask the project team to confirm the address before arranging access.
Distinguish a streetwork notice from a provider appointment. Record exactly what has been confirmed: infrastructure work, an electrical switchover, a telecommunications visit or restoration. Ask whether someone must attend and which areas the crew needs to reach.
The Town describes electrical switchover as taking approximately a couple of hours, with advance notification. Treat that as a general estimate; obtain the expected interruption window for your address before planning around it. Town undergrounding stages
Build your FPL, Comcast/Xfinity and AT&T tracker
Palm Beach’s undergrounding project involves three utilities: FPL, Comcast and AT&T. The Town’s project FAQ includes electrical, cable and telephone lines, and directs owners seeking fiber service to contact their provider. Record each applicable provider’s conversion separately; installed conduit alone does not establish activated service. Source: Town project FAQ.
Copy this table into your property record. Start with “unconfirmed” rather than leaving a blank that could be mistaken for completion. Mark providers you do not use not applicable.
| Provider | Conversion status and confirmation date | Observed service and check time | Outstanding appointment | Authorized access contact | Next action and due date |
|---|---|---|---|---|---|
| FPL | Unconfirmed; retain provider reference | Not checked | Date/window or awaiting confirmation | Name and number | Action, responsible person, date |
| Comcast/Xfinity | Unconfirmed or not applicable | Internet/TV/voice: record separately | Date/window or none confirmed | Name and number | Action, responsible person, date |
| AT&T | Unconfirmed or not applicable | Internet/voice: record separately | Date/window or none confirmed | Name and number | Action, responsible person, date |
For each confirmation, retain the email, notice or call reference and record what the provider actually confirmed. “Appointment completed” may need clarification before you label it “service activated.”
Use two independent completion tests:
- Provider confirmation: The provider confirms the relevant conversion or activation for your address.
- Owner observation: Your representative records which subscribed services and household systems operated, when checked, and any exceptions.
Working internet does not establish that its underground conversion is complete. A completed conversion does not establish that every connected device has recovered. Keep an unresolved appointment open even if service currently works.
Before your confirmed appointment, record the baseline
Once you have a confirmed window, arrange a baseline visit close enough to the appointment to make the comparison useful. Record:
- Thermostat settings, displayed indoor temperature and humidity where available.
- Whether internet, television and subscribed telephone service operate.
- Camera connection status, latest available images and monitoring-device status.
- Visible conditions around the work area, including paving, planting beds and irrigation components.
Timestamp photographs and readings. Note any existing fault so it is not automatically attributed to the switchover.
Arrange provider-accepted authorization for your local representative. Confirm gate entry, equipment locations, required interior access and who receives appointment changes. Keep passwords and permanent access codes out of a broadly shared tracker.
If an alarm or monitoring test is planned, agree on the procedure with that provider first. Ask equipment specialists for any device-specific shutdown or restart instructions. Your representative should have a defined observation and escalation role, with technical work assigned to the appropriate provider.
After each conversion, check cooling, connectivity and monitoring
Arrange a check after the provider reports service restored. Record the actual check time; do not prefill it from the appointment window.
Cooling: Compare thermostat settings and displayed conditions with the baseline. Record whether cooling appears to operate and arrange a follow-up reading if recovery is uncertain. An illuminated thermostat alone is insufficient evidence that the home is cooling.
Connectivity: Verify that the test device is connected to the home network rather than cellular data. Load a fresh webpage, then check subscribed television and telephone service separately. Record any service that remains unavailable.
Monitoring: Check current camera views and device timestamps rather than relying on a saved image. Confirm monitoring status through the applicable provider’s agreed procedure. Record any device that remains offline even when internet service has returned.
For every exception, enter the symptom, time observed, ticket reference, assigned contact and next follow-up date. If you cannot complete a check, write “not checked” with the reason. Preserve that distinction from “checked and failed.”
Track overhead removal, landscaping and paving separately
In its April 24, 2026 report, the Palm Beach Civic Association described Phase 6 South, from Seaspray Avenue to the south side of Royal Poinciana Way, as having completed utility conversions while AT&T fiber customer conversions continued. This historical example supports tracking infrastructure progress separately from household activation. Source: Civic Association progress report.
Add a separate physical closeout section beneath your provider rows:
| Closeout item | Record to retain |
|---|---|
| Overhead lines and poles | Observed condition, dated photo, project-team update |
| Landscape restoration | Specific location, before/after photos, unresolved item |
| Driveway or walkway disturbance | Location, photo, reported issue and response |
| Street paving | Latest phase notice, access implications, observed status |
The Town describes overhead removal, landscaping and final completion as distinct stages, with repaving dependent on completion of planned utility upgrades. Ask for the schedule relevant to your location. Town project-stage guidance
Your observation documents visible condition; it does not certify the contractor’s work. Keep each open item assigned to a contact and follow-up date.
Review unresolved items before your seasonal return
As a planning recommendation, review the tracker two weeks before arrival, then reconfirm unresolved appointments during your arrival week. Allow more time if provider availability requires it.
Your handoff should identify confirmed conversions, dated operating checks, outstanding visits and remaining restoration. Have your local representative flag anything affecting cooling, monitoring or access before you travel.
To discuss local support for your Palm Beach home, contact Black Tie White Glove with your phase, confirmed appointment window and return date. You can also review packages and memberships and confirm the appropriate scope before arranging representation.